The main welding line has a total of 13 stations, and adopts the form of lifting roller + skid conveying; The bodyside assembly line adopts manual pre-assembly line, the front top beam and the back top beam use manual pre-assembly line, and the top cover assembly line adopts manual sling line. The engine assembly, front bottom plate assembly and rear bottom plate assembly are equipped with lifting gear.